Common Property Insurance Repairs for Owners Corporations and Strata Managers

AxisPro Constructions repairs and reinstates common property for Victorian owners corporations, strata managers and facility managers after water ingress, fire, impact and structural damage. Every scope is written with the common-property and lot split set out in full, works are staged around residents and trading tenants, and the reporting is prepared so a committee can circulate it without editing it first.

What we deliver

Common property reinstatement

Damage to buildings, structures, walls, service installations and shared services on common property.

High-rise water ingress

Leak rectification and reinstatement in occupied towers, including source investigation before repair.

Cladding

Replacement and rectification, including works arising from insurance and defect-adjacent claims.

Balconies, planter boxes and membranes

Rectification where failure has caused ingress to lots below.

Commercial and retail tenancies

Fire, water and impact reinstatement in mixed-use buildings.

Common area upgrades

Amenities and common area works arising from a claim.

Reporting a committee can use

Photographic progress reports, a published program with milestone dates, clear variation documentation, and scopes written so the common-property and lot-owner split is legible. Strata managers and facility managers do not need to translate our reports before circulating them to owners.

The ten steps

  1. Step 1: Damage Is Reported on Common Property

    A resident, tenant or contractor reports damage. Before anything is moved, the condition is recorded — in a shared building the evidence is harder to recover than in a house, because access is controlled and multiple parties are involved.

    The manager
    Records the report, the date and the affected lots, and photographs the damage and its path through the building.
    Affected lot owners
    Are asked to photograph damage inside their own lots on the same day.
    Keep together
    Contractor attendance reports, plumber findings and any earlier reports of the same issue.

    What we watch for: Water damage reported lot by lot over several weeks, with no single record of the path through the building. It makes the source far harder to establish and the claim far harder to scope.

  2. Step 2: Establish What Is Common Property and What Is Lot

    Before the claim goes anywhere, the split has to be settled. It determines who claims, who pays the excess, and what the scope may include.

    Common property
    Under Victorian owners corporation rules this includes buildings, structures, walls, service installations and services shared beyond a single lot.
    Lot property
    The owner’s own space and, generally, their contents and internal finishes — usually a separate claim on their own policy.
    Where we help
    We scope both sides separately and clearly, so neither the OC nor the lot owner pays for the other’s damage.

    What we watch for: Scopes that blur the boundary. It is the most common reason a common property claim stalls, and the most common source of disputes between an OC and its owners.

  3. Step 3: Notify the Owners Corporation Insurer

    Victorian owners corporations must hold reinstatement and replacement insurance for buildings on common property, plus public liability cover. The OC or its manager lodges the claim on that policy.

    What is lodged
    Policy details, the date and cause, the photographic record, affected lots and any contractor reports.
    Reinstatement cover
    Extends to replacement, repair and rebuilding of the damaged property, demolition and debris removal, and professional fees.
    Lot owners
    Lodge separately for their own contents and internal damage where their policy responds.

    What we watch for: The OC claim and the lot owners’ claims progressing on different timelines with no coordination, so the building is opened up twice.

  4. Step 4: We Assess and Document

    A builder inspects the common property and the affected lots, establishes the source rather than only the symptom, and records what the insurer and the committee both need.

    Source first
    In water ingress claims we investigate where the water is entering before pricing what it damaged. Repairing the symptom guarantees a repeat claim.
    Access
    Coordinated with the manager, with notice to residents and out-of-hours inspection where lots are occupied.
    Output
    A written condition report with dated photography, suitable for circulation to owners.

    What we watch for: Scoping the stained ceiling and not the failed membrane above it. The claim closes, the water returns, and the second claim is harder to place.

  5. Step 5: Scope of Works, With the Split Written Out

    We produce one scope with the common property and lot works clearly separated, each line-item priced, in the format the insurer or adjuster expects.

    Why separated
    So the committee can see exactly what the OC is funding, and each lot owner can see what falls to them.
    Betterment and upgrades
    Any owner-funded improvement is separated from the insured reinstatement and priced on its own.
    Format
    Line-item, in the insurer’s or adjuster’s required format, so it can be assessed without a second round of questions.

    What we watch for: A single blended figure. A committee cannot approve what it cannot break down, and an insurer will not pay for what it cannot separate.

  6. Step 6: Committee Approval and Owner Communication

    Common property works usually need a committee resolution, and always need residents to know what is happening.

    What we provide
    A scope, program and photographic report written for circulation — no translation needed before it goes to owners.
    Meetings
    We attend committee or general meetings to present the scope and answer questions where that helps the decision.
    Residents
    A works notice covering dates, hours, access, noise and parking, issued before work starts.

    What we watch for: Works starting before residents have been told. It generates complaints that land on the manager, not the builder, and slows the whole program.

  7. Step 7: Contract, Permits and Practitioners

    Contract executed with the owners corporation, permits obtained and registered practitioners engaged before work begins.

    Permits
    Structural and most reinstatement works need a building permit. We confirm requirements as part of scoping.
    Building access
    Inductions, site rules, lift protection, loading dock bookings and after-hours arrangements agreed in advance.
    Insurances
    Certificates of currency provided to the OC and the manager before mobilisation.

    What we watch for: Mobilising without lift and loading access confirmed. In an occupied tower it can cost a week before a tool is lifted.

  8. Step 8: Staged Works Around Residents and Tenants

    One supervisor, a published program with milestone dates, and works staged so the building keeps functioning.

    Occupied buildings
    Protected access routes, dust and noise control, and out-of-hours programming where the works affect entries, lifts or trading tenants.
    Single point of contact
    The manager deals with one named person, not a rotating list of trades.
    Progress reporting
    Photographic updates at agreed intervals, in a form the committee can circulate.

    What we watch for: Programs that ignore trading hours and resident access. In a mixed-use building that is what turns a repair into a complaint file.

  9. Step 9: Concealed Damage and Variations

    Opening up common property in an older building routinely reveals more than the scope allowed for.

    How we handle it
    Documented with photographic substantiation, submitted to the insurer, and reported to the committee before the work is carried out.
    Common finds
    Failed membranes, corroded services, previous unpermitted alterations, and damage extending into further lots.
    Before linings close
    Concealed work is verified and photographed, so what is behind the wall is on record for the building’s history.

    What we watch for: Variations approved by the builder and the insurer but never reported to the committee — which is how a manager gets ambushed at the next meeting.

  10. Step 10: Handover, Reporting and Warranty

    Defect close-out, compliance certificates, warranties and a complete as-completed record, issued to the owners corporation and the manager.

    The handover pack
    Certificates, warranties and the full photographic record, in a form that goes into the building’s maintenance history.
    Maintenance plan
    Where the works affect it, we set out what has changed so the OC’s maintenance plan can be updated.
    If a dispute cannot be resolved
    Owners corporation disputes about repairing and maintaining common property can be taken to VCAT under section 169A of the Owners Corporations Act 2006.

    What we watch for: Handover without a document set the building can keep. A common property repair is part of the building’s permanent record, not just a closed job.